Smart tech Factory

  • PROJECT CATEGORY – Industrial
  • TATE – Architectural Design and Execution
  • LOCATION – Gonde
  • STATUS – Completed
  • START YEAR-2007
  • END YEAR – 2009
  • CLIENTS – Anil Printers
  • AREA – Plot Area – 7.5 acres
    Construction Area – 75,000 sq.ft
  • COST – 15 Cr.

PROJECT DESCRIPTION -This project was started with a simple belief that a Design should always look like the function it is meant for” and therefore, the showroom must look and therefore, the factory must look simple , serene yet beguiling.

The spaces were planned warily according to their functionality using post tension slabs.

This long span structure had a very beguiling glass facade that enhanced its charisma .



« 1 of 2 »
FacebookTwitterGoogle+LinkedInShare